The introduction of the coal pulverizing system in Daya Bay Nuclear Power Plant vastly reduces the time it took______.

admin2014-09-18  37

问题 The introduction of the coal pulverizing system in Daya Bay Nuclear Power Plant vastly reduces the time it took______.

选项 A、to mill the coal
B、milling the coal
C、for milling the coal
D、while milling the coal

答案A

解析
转载请注明原文地址:https://jikaoti.com/ti/tuxMFFFM
0

最新回复(0)