首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A、Aldwych Tube. B、King’ s Cross. C、Baker Street. D、The Tube. D
A、Aldwych Tube. B、King’ s Cross. C、Baker Street. D、The Tube. D
admin
2018-06-24
31
问题
(22)“The Tube” begun in 1863 as direct response to traffic congestion and was the world’s first underground railway system. Steam locomotives first ran on the Metropolitan Line with air so noxious. It was likened to crocodile breath. (23)Moving mail underground in London also started in the mid-19th century.
In 1861, a private company set up a cast-iron pneumatic tube system. Basically, a steam engine powered a large fan into a narrow tube: carriages were blown one way, then dragged back the other way by suction. Getting into a pneumatic carriage—as some test engineers did—must have been like jumping into a modern four-man bobsleigh. In 1865, the Illustrated London News reported on the launch of a pneumatic line under Euston Station, top-hatted Victorians looking on earnestly at this wonder of the age. But after multiple experiments, it failed to attract investors and in 1908, British Post Office engineers visited Chicago to look at (24)its new freight subway system—a labyrinth of tunnels criss-crossing under the city’s famous Loop for almost 100 kilometers (60 miles).
The British visitors were deeply impressed; the General Post Office—then a government department—decided that it would also go underground and electric; something had to be done to avoid the heavy, largely horse-drawn, London traffic of the early 1900s. The Post Office Railway Bill passed into law in 1913 and tunneling work commenced the following year. Coinciding with the outbreak of the First World War, it would take much longer than expected. Over 1,000 tons of cast iron track had to be laid. (25)When the postal railway line finally opened in 1927, it was evidently a triumph, carrying up to four million letters a day between eight London sorting offices.
Questions 22 to 25 are based on the passage you have just heard.
22.What was the world’s first underground railway system?
23.When did moving mail underground in London start?
24.How long was the new freight subway system?
25.When did the postal railway line finally open?
选项
A、Aldwych Tube.
B、King’ s Cross.
C、Baker Street.
D、The Tube.
答案
D
解析
转载请注明原文地址:https://jikaoti.com/ti/PIRFFFFM
0
大学英语四级
相关试题推荐
Thereisapopularbeliefamongparentsthatschoolsarenolongerinterestedinspelling.Thisis,however,a【C1】______.Nosch
Thereisapopularbeliefamongparentsthatschoolsarenolongerinterestedinspelling.Thisis,however,a【C1】______.Nosch
Impressionismisaformofartthatbeganinthe1870’s.Whenyoulookcloselyatanimpressionistpainting,youseelittledots
Impressionismisaformofartthatbeganinthe1870’s.Whenyoulookcloselyatanimpressionistpainting,youseelittledots
Impressionismisaformofartthatbeganinthe1870’s.Whenyoulookcloselyatanimpressionistpainting,youseelittledots
Impressionismisaformofartthatbeganinthe1870’s.Whenyoulookcloselyatanimpressionistpainting,youseelittledots
A、Sydney.B、Paris.C、Tokyo.D、NewYorkCity.C短文提到,新加坡取代去年位于榜首的东京,成为生活成本最高的城市,故选C。
A、SheinvestedinstocksandsharesonWallStreet.B、Shelearnedtowriteforfinancialnewspapers.C、Shedevelopedastrongin
A、AldwychTube.B、King’sCross.C、BakerStreet.D、TheTube.D
随机试题
吴某因涉嫌盗窃犯罪被某公安机关立案侦查。在侦查过程中,公安机关对其采取了监视居住的强制措施,但吴某对此不服,他可以依法申请行政复议。()
关于乳糜尿的叙述,正确的是
冲沟的防治措施包括生物措施和工程措施两个方面,以下不属于生物措施的是()
监理工程师应当按照《建设工程监理规范》(GB50319—2000)的要求,采取( )等形式,对建设工程实施监理。
建设单位领取施工许可证后,因故不能按期开工的,应当向发证机关申请延期,延期次数和每次期限分别为( )。
货运代理,简称“货代”,是根据托运人的委托,为托运人提供服务的人,其本人并非承运人(NVOCC除外)。()
对于银行个人理财业务从业人员的行为,下列说法正确的有()。
下列少数民族政权及其创建者之间对应关系完全正确的一组是()。
天安门事件
计算各工作的持续时间、最早开始时间,并分析每项工作的紧前工作代码,填入下表。请根据上表5-1将该项目的单代号网络图补充完整。
最新回复
(
0
)