首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
27
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M4】
选项
答案
ON
解析
此处的including为及物动词的ing形式,后面直接跟宾语,无需介词与其搭配,故ON多余。
转载请注明原文地址:https://jikaoti.com/ti/VuTYFFFM
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
WhatdoPOPprojectsaimtodo?WhathasmadeTVadvertisinglesseffective?
HowtoapproachListeningTestPartTwo•Thispartisintwosections.Ineachsectionyoulistentofiveshortmonologues,spo
Brazilianstakepridein______.Whenschedulingmeetingsinsoutherncities,you’llfindthebusinesssettingsare______.
•Lookatthenotesbelow.•Youwillhearawomanleavingamessageaboutameeting.TODAYBUSINESSMAGAZINE
•Youwillhearanotherfiverecordings.•Youwillhearfivespeakerstalkingaboutrunningprojectteams.•Foreachrecording
•Youwillhearfivespeakerstalkingaboutbusinesstrips.•Foreachrecording,choosethereasonthespeakergivesforthetr
SamWalton’sstorerunningconceptdoesnotinclude
YouwillheararadiointerviewwithDr.EdwardGordon,theHumanResourcesmanagerfromOrchardSupplyHardware.Foreachq
—Readthearticleaboutinterviewbelow.—Choosethebestsentencetofillineachofthegaps.—Foreachgap8-12,markonelet
—Readthearticleaboutinterviewbelow.—Choosethebestsentencetofillineachofthegaps.—Foreachgap8-12,markonelet
随机试题
大黄后下的目的是
CD3和CD4抗原存在于
遵守医嘱包括以下哪些行为
为开拓市场需要,个人独资企业主曾水决定在某市设立一个分支机构,委托朋友霍火为分支机构负责人。关于霍火的权利和义务,下列哪一表述是正确的?(卷三2012年真题试卷第29题)
背景资料:某公路工程项目合同工期为18个月。施工合同签订以后,施工单位编制了一份初始网络计划,如下图所示。由于该工程施工工艺的要求。计划中工作C、工作H和工作J需共用一台起重施工机械,为此需要对初始网络计划做调整。问题:该计划执行3个月后,施工
根据建设工程施工文件档案管理的要求,项目竣工图应()。
框架式临时码头的特点不包括()。
提案:政协委员:政协会议
李东阳是某家用电器企业的战略规划人员,正在参与制定本年度的生产与营销计划。为此,他需要对上一年度不同产品的销售情况进行汇总和分析,从中提炼出有价值的信息。根据下列要求,帮助李东阳运用已有的原始数据完成上述分析工作。在“销售记录”工作表的F4:F891中
READINGHavinganabundanceofstuffisasymptomof21stCenturymaterialism--peopleareconditionedbysocietytothinkth
最新回复
(
0
)