首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
23
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M5】
选项
答案
IN
解析
英文中assist表示“协助”的用法有两种:assist sb.或者assist sb.in doing sth.。该句中属于第一种用法,故IN多余。
转载请注明原文地址:https://jikaoti.com/ti/wuTYFFFM
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
•YouwillheartwopeoplediscussingPointofPurchasing(POP)projects.•Foreachquestion23-30markoneletter(A,BorC)fort
•Lookatthenotebelow.•Youwillhearamanleavingamessageonanansweringmachine.
•Lookatthenotebelow.•Youwillhearamancallingaboutmeetingwithsomebody.FRENCHBUSINESSTRIP:Wed2/10-10-Fri4/10Ap
Brazilianstakepridein______.Whenschedulingmeetingsinsoutherncities,you’llfindthebusinesssettingsare______.
TheNationalWeatherCentre’smostrecentcustomersareWhyistheCentreconfidentaboutretainingstaffatitsnewlocation?
TheNationalWeatherCentre’smostrecentcustomersareWhatconclusionwasreachedabouttheeventualchoiceoflocation?
InherjobasrecruitmentmanageratBCF,KateKidmanMs.KidmanthinksthatthepresentHigherEducationsystem
•Youwillhearanotherfiverecordings.•Youwillhearfivespeakerstalkingaboutrunningprojectteams.•Foreachrecording
—Readthearticleaboutchoosinganagent.—Inmostofthelines34~45thereisoneextraword.Itiseithergrammaticallyincor
—Readthearticleaboutchoosinganagent.—Inmostofthelines34~45thereisoneextraword.Itiseithergrammaticallyincor
随机试题
难降解的有毒物质沿食物链“浮游植物→浮游动物→鱼→猫”传递时,体内该有毒物质浓度最高的生物是
湿热痢宜用何方治疗
慢性支气管炎起病、加重和复发的基本原因是
在建设工程目标控制措施中,( )是其他措施的前提和保障。
建设工程监理的服务对象具有()。
采用器运港船上交货价(FOB)进口设备时,卖方的责任包括( )。
一个债务人只能拥有一个债项评级。()
数据模型是数据库系统的核心和基础,数据模型通常由哪三部分组成?数据库最常用的数据模型有哪三种?
下列各艺术类型中,不属于视觉艺术的是()。
教育心理学是一门()。
最新回复
(
0
)