首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
36
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
Which of the following results Howard Gerber will accept?
选项
A、Get the refund.
B、Get the apology.
C、Reinstallation.
D、None of the above.
答案
C
解析
转载请注明原文地址:https://jikaoti.com/ti/rIMsFFFM
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Forabouthowlonghasthecompanybeeninbusiness?
Whendidthemanstartworkingatthiscompany?
WhatwilltheStonebarkCompanydoonMarch1?
A、 B、 C、 A(A)在做出肯定回答之后,又补充指出,不包括牙科治疗,故为正确答案。(B)与健康保险的内容无关,所以此项是错误的。(C)company一词重复出现。使用与health有关的单词sick,易造成误导,并
Accordingtotheman,whatchangewillbemadetothecompany?
Accordingtotheman,whatchangewillbemadetothecompany?
A、 B、 C、 A(A)在反问really的同时,补充说明看上去没有那么旧,故为正确答案。(B)使用与building发音相似的bill,需多加注意。(C)使用从building中可以联想到的companyworke
Whattypeofcompanyisthecallerworkingfor?
随机试题
A.叶酸B.钾盐C.钙剂D.铁剂E.蛋白质营养性巨幼红细胞贫血主要补充
男性,52岁。反复无痛性肉眼血尿伴条状血块2个月,膀胱镜检见右输尿管口喷血,尿细胞学可见癌细胞。静脉尿路造影最有诊断价值的X线表现是
仲裁机构受理纠纷的前提是( )。
背景材料:某写字楼工程,建筑面积14352m2。箱型基础,现浇钢筋混凝土框架结构。目前进行内部装修阶段,在装修施工前,已对各部位装修材料的燃烧性能进行了技术交底工作。装修工程完工后,建设单位项目负责人组织施工单位项目负责人、监理工程师和设计单
与用益物权相比,担保物权特有的特征为()。
下列关于战略风险管理的说法,正确的是( )。
下图表明儿童的发展具有()。
某人共收集邮票若干张,其中1/4是2007年以前的国内发行的邮票,1/8是2008年国内发行的,1/19是2009年国内发行的,此外尚有不足100张的国外邮票。则该人共有()张邮票。
Inthepasttimemanyyoungmarriedcoupleoftenhadchildren______.Agoodtitleforthisarticlewouldbe"______".
pool在第二个话轮中女士描述自己的活动时,第六句即指出;AndthenIsometimes...inmypool。注意本题也可由常识得出答案,因为游泳(swim)只能在她自己的游泳池中进行。
最新回复
(
0
)