A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
admin
2020-08-10
40
问题
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be completed by a specific time, within budget, and according to (72).
Project management is the process of scoping, planning, staffing,organizing, directing, and controlling the development of a(n) (73) system at a minimum cost within a specified time frame.
For any systems development project, effective project management is necessary to ensure that the project meets the (74) , is developed within an acceptable budget, and fulfills customer expectations and specifications. Project management is a process that starts at the beginning of a project, extends through a project, and doesn’t culminate until the project is completed.
The prerequisite for good project management is a well-defined system development process. Process management is an ongoing activity that documents, manages the use of, and improves an organization’s chosen methodology (the “process”)for system development. Process management is concerned with the activities, deliverables, and quality standards to be applied to (75) project(s).
(72)
选项
A、specifications
B、rules
C、estimates
D、designs
答案
A
解析
转载请注明原文地址:https://jikaoti.com/ti/mNG7FFFM
本试题收录于:
软件设计师上午基础知识考试题库软考中级分类
0
软件设计师上午基础知识考试
软考中级
相关试题推荐
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
随机试题
在企业有盈利.需要追加外部投资的情况下,下列有关外部融资需求的表述正确的是()。
丈量计算油管的累计长度误差不超过0.05%。()
脑复苏中施行低温疗法作用是
A、具发汗平喘作用B、具抗菌作用C、具镇痛作用D、具镇静麻醉作用E、具消肿利尿抗肿瘤作用麻黄碱
甘遂可用于治疗
背景资料:某施工单位中标建设一公路工程,该公路工程包括12km的路基路面和一桥梁工程。其网络图编制如下,并得到监理工程师的批准。路基施工中需要10多万m3的土方,填方采用松散的砂性土和黏土,含水量在25%左右。土方料场距填方处在200~300m左右。
2015年某商贸公司以经营租赁方式租入临街门面房,租期为10年。2015年3月公司对门面房进行改建装修,发生改建支出20万元。下列说法正确的是()。
设y=y(x)由dt=x+1-y确定,则=________.
软件设计模块化的目的是()。
WhichrhetoricaldeviceisthemostimportantinBeowulf?
最新回复
(
0
)