A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
admin
2020-08-10
34
问题
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be completed by a specific time, within budget, and according to (72).
Project management is the process of scoping, planning, staffing,organizing, directing, and controlling the development of a(n) (73) system at a minimum cost within a specified time frame.
For any systems development project, effective project management is necessary to ensure that the project meets the (74) , is developed within an acceptable budget, and fulfills customer expectations and specifications. Project management is a process that starts at the beginning of a project, extends through a project, and doesn’t culminate until the project is completed.
The prerequisite for good project management is a well-defined system development process. Process management is an ongoing activity that documents, manages the use of, and improves an organization’s chosen methodology (the “process”)for system development. Process management is concerned with the activities, deliverables, and quality standards to be applied to (75) project(s).
(72)
选项
A、specifications
B、rules
C、estimates
D、designs
答案
A
解析
转载请注明原文地址:https://jikaoti.com/ti/mNG7FFFM
本试题收录于:
软件设计师上午基础知识考试题库软考中级分类
0
软件设计师上午基础知识考试
软考中级
相关试题推荐
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
随机试题
下面描述正确的是______。
A.嗜异性凝集试验(+++),肾组织吸附后(+++),细胞悬液吸附后(+++)B.嗜异性凝集试验(+++),肾组织吸附后(+++),细胞悬液吸附后C.嗜异性凝集试验(+++),肾组织吸附后(一),细胞悬液吸附后(一)D.嗜异性凝集试验(一
实现我国宏观经济管理目标和主要任务的两个主要调控手段是()。
热塑性塑料中,具有优良的耐蚀性,电阻高,是很好的隔热、防振和高频绝缘材料,但其耐冲击性差,不耐沸水,耐油性有限的为()。
有爆炸危险的厂房、仓库采取有效的防爆措施。下列措施符合要求的是()。
该企业本期销项税额为( )元。该企业本期应转出的进项税额为( )元。
根据《证券法》的规定,下列尚未公开的信息中,属于内幕信息的有()。
甲贩运假烟,驾车路过某检查站时,被工商执法部门拦住检查。检查人员乙正登车检查时,甲突然发动汽车夺路而逃。乙抓住汽车车门的把手不放,甲为摆脱乙,在疾驶时突然急刹车,导致乙头部着地身亡。甲对乙死亡的心理态度属于下列哪一选项?()
甲乙两人相约骑共享单车运动健身。停车点现有9辆单车,分属3个品牌,各有2、3、4辆。假如两人选择每一辆单车的概率相同,两人选到同一品牌单车的概率约为:
A、 B、 C、 C图片A是黄瓜,图片B是苹果,图片C是一束花。故本题答案为C。
最新回复
(
0
)