首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Art Murals Why is the class discussing the technical requirements of murals?
Art Murals Why is the class discussing the technical requirements of murals?
admin
2013-04-25
43
问题
Art Murals
Why is the class discussing the technical requirements of murals?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、They are preparing for an examination.
B、They plan to visit some famous murals.
C、They are helping to design a new building.
D、They will be creating their own mural.
答案
D
解析
The class will be creating their own mural. The instructor says I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. (2.3)
转载请注明原文地址:https://jikaoti.com/ti/lClYFFFM
0
托福(TOEFL)
相关试题推荐
SECTION2Questions11-20Questions11-15AnswerthefollowingquestionsusingNOMORETHANTWOWORDSforeachanswer
PrairieDogbarkshave______meanings.PrairieDogsinArizonaandColoradoappeartospeakdifferent,butmutually-comprehens
Whattimedoesthelibraryopen?WhenwillSaturday’sfootballtrialsprobablyend?
Completethenotesbelow.WriteONEWORDAND/ORANUMBERforeachanswer.Requirements:GoodliftaccessLargel
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.Otherrequirementsfortheprojectextractchosen
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoquestions11-15.
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Choosethecorrectletter,A,BorC.Grace’sCreekActivityCampOnebuildinghasnotbeendecidedyet,butwillprobablybe
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoQuestions11-15.Essential
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
随机试题
在法庭审理过程中,被告人屠某、沈某和证人朱某提出在侦查期间遭到非法取证,要求确认其审前供述或证言不具备证据能力。下列哪些情形下应当根据法律规定排除上述证据?()
《嘉陵江畔的传奇》的作者是()
TheFirstSettlementinNorthAmericaItisverydifficulttosayjustwhencolonization(殖民)began.Thefirsthundredyears
造影期间的造影像指的是
适用于G-厌氧菌感染抗结核一线药物
经审理,一审法院判决被告王某支付原告刘某欠款本息共计22万元。王某不服提起上诉。二审中,双方当事人达成和解协议,约定:王某在3个月内向刘某分期偿付20万元,刘某放弃利息请求。案件经王某申请撤回上诉而终结。约定的期限届满后,王某只支付了15万元。刘某欲寻求法
房地产转让当事人在房地产转让合同签订后()日内,持房地产权属证书、当事人的合法证明、转让合同等有关文件,向房地产所在地的房地产管理部门提出申请,并申报成交价格。
一座容纳人数为2400人的剧场,需要设置的疏散门数量为()个。
(1)发现问题(2)拿出备选方案(3)调查研究(4)确定方案(5)付诸实施,解决问题
Focusonwhatyoudobest.Thisage-oldstrategyhasworkedwellforRealNetworks,Microsoft’smaincompetitorinmultimediasof
最新回复
(
0
)