首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely s
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely s
admin
2014-11-27
33
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs.
According to the passage, all of the following are sources of radioactive waste EXCEPT______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
细节题。作者在第三段提到核废料的来源有:Powerplants andbomb—making are notthe only sources ofwaste.Uranium mining and milling operations…显然没有提到B选项的内容,故选B。
转载请注明原文地址:https://jikaoti.com/ti/h99FFFFM
0
大学英语四级
相关试题推荐
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】_____waterbytakingshortershowers.Butit’sjustas
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】_____waterbytakingshortershowers.Butit’sjustas
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】_____waterbytakingshortershowers.Butit’sjustas
Anewreportclaimsthatthemakersofsugar-laden(含糖)drinkssuchassodas,sportsdrinks,energydrinksandfruitdrinkstaked
Anewreportclaimsthatthemakersofsugar-laden(含糖)drinkssuchassodas,sportsdrinks,energydrinksandfruitdrinkstaked
Anewreportclaimsthatthemakersofsugar-laden(含糖)drinkssuchassodas,sportsdrinks,energydrinksandfruitdrinkstaked
随机试题
下列对婴儿耳的发育特点描述不正确的选项是()
火山灰质硅酸盐水泥的代号是___________。
设备监理目标的( )首先表明按照承包合同、国家的技术规范和质量标准、劳动生产定额及经济参数制定的目标值是可行的、合理的;其次,给定的目标值在现有的生产条件和市场条件下,承包商运用现代生产技术、科学管理方法和严格的检验手段是可以完成的;最后,给定的目标值在
为确保灌注桩顶质量,在桩顶设计标高以上应加灌一定高度,一般不宜小于()。
小王计划采用个人汽车消费贷款的方式购买一辆新车,计划向银行贷款5万元,期限为3年。关于个人汽车消费额贷款,说法不正确的是()。
甲企业2012年度利润总额为220万元,其中包括本年收到的国债利息收入30万元。该企业适用的所得税税率为25%。该企业当年按税法核定允许在税前扣除的工资为100万元,实发工资为90万元;当年的营业外支出中,有10万元为税款滞纳金支出。企业递延所得税负债的年
合营企业的组织形式有限责任公司的,下列有关该类企业组织机构的表述中,符合中外合资经营企业法律制度规定的是()。
公共营养师的核心工作内容是()。
相对于影响范围较小、较方便找到污染源头的水污染、噪音污染,大气污染的成因复杂,往往是跨地域的工业污染、汽车排放乃至烹饪油炯等等,再加上特定的天气因素共同造成了雾霾等灾害性天气。这就很难将某天的雾霾归因于具体的哪个、哪几个企业的污染,那么受大气污染损害的公民
Whenitcomestotheslowingeconomy,EllenSperoisn’tbitinghernailsjustyet.Butthe47-year-oldmanicuristisn’tcutting,
最新回复
(
0
)