London’s First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It i
London’s First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It i
admin
2009-06-15
42
问题
London’s First Light Rail System
The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It is London’s first Light Rail System, but its route follows that of a number of older lines, which carried the nineteenth century railways through the crowded districts of the East End.
The section of the line from the Tower Gateway Station to Poplar follows the line of one of London’s earliest railways, the London & Blackwell (1840), a cable-drawn railway (later converted to steam) which carried passengers to steam ships at Blackwell Pier, and provided transport for the messengers and clerks who went backwards and forwards between the docks (码头) and the city every day.
From Poplar to Island Gardens, a new line crosses high above the dock waters, and then joins the old track of the Millwall Extension Railway, built to service the Mil[wall Docks (1868) and to provide transport for workers in the local factories. This line was horse-drawn for part of its route, until the 1880s.
The Poplar to Stratford section of the DLR route was first developed by the North London Railway, built in the 1850s to link the West and East India Docks with the manufacturing districts of the Midlands and North of ’England. There were major railway works and sidings (岔线) at Bow until recently.
The trains are automatically controlled from a central computer, which deals with all signaling and other safety factors, as well as adjusting speeds to keep within the timetable; on board each vehicle, Train Captains, who are also fully qualified drivers, are equipped with two-way radios to maintain contact with central control. There are passenger lifts, and self-service ticket machines, at every station.
选项
A、was constructed in the nineteenth century.
B、will be finished in three years’ time.
C、follows some of the original lines.
D、took three years longer than expected to complete.
答案
C
解析
转载请注明原文地址:https://jikaoti.com/ti/bROsFFFM
本试题收录于:
职称英语理工类C级题库职称英语分类
0
职称英语理工类C级
职称英语
相关试题推荐
Thestaffofthecompanyarealwayscourteousandhelpful.
Medicinedependsonotherfieldsforbasicinformation,particularlysomeoftheirspecializedbranches.
A.10percentto25percentfortheproportionofworkerswhousedrugsoccasionallyonthejobB.determineexactlywhensimpl
Untilthelatenineteenthcentury,therewasnouniformsystemoftime-keepingintheUnitedStates.
Thepassagecouldbeentitled______.Accordingtothepassage,youngpeoplelovecoffeebecauseof______.
BreastCancerDeathsRecordLowThenumberofwomendyingfrombreast(乳房)cancerhasfallentoarecordlowbydroppingund
Common-coldSenseYoucan’tbeatit,butyoudon’thavetojoinit.Maybeitgotthename"commoncold"becauseit’smorec
Thetiesymbolizesallofthefollowingexcept______.WhichofthefollowingisNOTasocialoccasion?
IntheUS,aperson’scompanybuyshimorherhealthinsurance.AllinternationalstudentsintheUShavetobuyhealthinsuran
Whydidmanywomenfeelthatknittingwasoutofdate?Theword"quit"inparagraph2isclosestinmeaningto______.
随机试题
冷裂纹又称延迟裂纹。()
Universitiesaresupposedto______newopportunitiesforthosegraduateswhowanttostarttheirownbusinesses.
比表面积是单位体积所有的表面积。()
甲基红试验阳性结果为()。
某公路建设项目的建设单位通过招标与某施工单位按《公路工程标准施工招标文件》(2018年版)中合同协议书格式签订了施工承包合同。该项目路基单位工程主要的分项工程包括开挖土方、填方等。施工承包合同规定按实际完成工程量计价。承包人必须严格按照施工图及承
《会计法》规定,原始凭证记载的各项内容均不得涂改。()
材料一:面对逆全球化思潮,中国已成为经济全球化的坚定倡导者和捍卫者。中国国家主席习近平在达沃斯世界经济论坛2017年年会释放了一个强烈信号:中国坚决捍卫经济全球化。经济全球化是社会生产力发展的客观要求和科技进步的必然结果,它为世界经济增长提供了强劲动力,
数据独立是数据库技术努力追求的目标,数据独立又有两个含义,即物理独立性和______独立性。
HowAdvertisementIsDone?A)Whenwechooseawordwedomorethangiveinformation;wealsoexpressourfeelingsaboutwha
A、Achemistryassignment.B、Astudythattheirchemistryprofessordid.C、Aclassthatthewomanistaking.D、Ajobpossibility.
最新回复
(
0
)