首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
You should spend about 20 minutes on Questions 14-26, which are based on Reading Passage 2 below. Keep
You should spend about 20 minutes on Questions 14-26, which are based on Reading Passage 2 below. Keep
admin
2017-09-22
16
问题
You should spend about 20 minutes on Questions 14-26, which are based on Reading Passage 2 below.
Keep the Water Away
A Last winter’s floods on the rivers of central Europe were among the worst since the Middle Ages, and as winter storms return, the spectre of floods is returning too. Just weeks ago, the river Rhone in south-east France burst its banks, driving 15,000 people from their homes, and worse could be on the way. Traditionally, river engineers have gone for Plan A: get rid of the water fast, draining it off the land and down to the sea in tall-sided rivers re-engineered as high-performance drains. But however big they dug city drains, however wide and straight they made the rivers, and however high they built the banks, the floods kept coming back to taunt them, from the Mississippi to the Danube. And when the floods came, they seemed to be worse than ever. No wonder engineers are turning to Plan B: sap the water’s destructive strength by dispersing it into fields, forgotten lakes, flood plains and aquifers.
B Back in the days when rivers took a more tortuous path to the sea, flood waters lost impetus and volume while meandering across flood plains and idling through wetlands and inland deltas. But today the water tends to have an unimpeded journey to the sea. And this means that when it rains in the uplands, the water comes down all at once. Worse, whenever we close off more flood plains, the river’s flow farther downstream becomes more violent and uncontrollable. Dykes are only as good as their weakest link—and the water will unerringly find it. By trying to turn the complex hydrology of rivers into the simple mechanics of a water pipe, engineers have often created danger where they promised safety, and intensified the floods they meant to end. Take the Rhine, Europe’s most engineered river. For two centuries, German engineers have erased its backwaters and cut it off from its flood plain.
C Today, the river has lost 7 percent of its original length and runs up to a third faster. When it rains hard in the Alps, the peak flows from several tributaries coincide in the main river, where once they arrived separately. And with four-fifths of the lower Rhine’s flood plain barricaded off, the waters rise ever higher. The result is more frequent flooding that does ever-greater damage to the homes, offices and roads that sit on the flood plain. Much the same has happened in the US on the mighty Mississippi, which drains the world’s second largest river catchment into the Gulf of Mexico.
D The European Union is trying to improve rain forecasts and more accurately model how intense rains swell rivers. That may help cities prepare, but it won’t stop the floods. To do that, say hydrologists, you need a new approach to engineering not just rivers, but the whole landscape. The UK’s Environment Agency—which has been granted an extra £150 million a year to spend in the wake of floods in 2000 that cost the country £1 billion—puts it like this: "The focus is now on working with the forces of nature. Towering concrete walls are out, and new wetlands are in." To help keep London’s feet dry, the agency is breaking the Thames’s banks upstream and reflooding 10 square kilometres of ancient flood plain at Otmoor outside Oxford. Nearer to London it has spent £100 million creating new wetlands and a relief channel across 16 kilometres of flood plain to protect the town of Maidenhead, as well as the ancient playing fields of Eton College. And near the south coast, the agency is digging out channels to reconnect old meanders on the river Cuckmere in East Sussex that were cut off by flood banks 150 years ago.
E The same is taking place on a much grander scale in Austria, in one of Europe’s largest river restorations to date. Engineers are regenerating flood plains along 60 kilometres of the river Drava as it exits the Alps. They are also widening the river bed and channelling it back into abandoned meanders, oxbow lakes and backwaters overhung with willows. The engineers calculate that the restored flood plain can now store up to 10 million cubic metres of flood waters and slow storm surges coming out of the Alps by more than an hour, protecting towns as far downstream as Slovenia and Croatia.
F "Rivers have to be allowed to take more space. They have to be turned from flood-chutes into flood-foilers," says Nienhuis. And the Dutch, for whom preventing floods is a matter of survival, have gone furthest. A nation built largely on drained marshes and seabed had the fright of its life in 1993 when the Rhine almost overwhelmed it. The same happened again in 1995, when a quarter of a million people were evacuated from the Netherlands. But a new breed of "soft engineers" wants our cities to become porous, and Berlin is their shining example. Since reunification, the city’s massive redevelopment has been governed by tough new rules to prevent its drains becoming overloaded after heavy rains. Harald Kraft, an architect working in the city, says: "We now see rainwater as a resource to be kept rather than got rid of at great cost." A good illustration is the giant Potsdamer Platz, a huge new commercial redevelopment by Daimler Chrysler in the heart of the city.
G Los Angeles has spent billions of dollars digging huge drains and concreting river beds to carry away the water from occasional intense storms. The latest plan is to spend a cool $280 million raising the concrete walls on the Los Angeles river by another 2 metres. Yet many communities still flood regularly. Meanwhile this desert city is shipping in water from hundreds of kilometres away in northern California and from the Colorado river in Arizona to fill its taps and swimming pools, and irrigate its green spaces. It all sounds like bad planning. "In LA we receive half the water we need in rainfall, and we throw it away. Then we spend hundreds of millions to import water," says Andy Lipkis, an LA environmentalist, along with citizen groups like Friends of the Los Angeles River and Unpaved LA, want to beat the urban flood hazard and fill the taps by holding onto the city’s flood water. And it’s not just a pipe dream. The authorities this year launched a $100 million scheme to road-test the porous city in one flood-hit community in Sun Valley. The plan is to catch the rain that falls on thousands of driveways, parking lots and rooftops in the valley. Trees will soak up water from parking lots. Homes and public buildings will capture roof water to irrigate gardens and parks. And road drains will empty into old gravel pits and other leaky places that should recharge the city’s underground water reserves. Result: less flooding and more water for the city. Plan B says every city should be porous, every river should have room to flood naturally and every coastline should be left to build its own defences. It sounds expensive and Utopian, until you realise how much we spend trying to drain cities and protect our watery margins—and how bad we are at it.
Questions 14-19
Reading Passage 2 has seven paragraphs, A-G.
Which paragraph contains the following information?
Write the correct letter, A-G, in boxes 14-19 on your answer sheet.
illustration of an alternative plan in LA which seems much unrealistic
选项
答案
G
解析
题干说:哪个段落列举了LA新的方案,但是方案不太切合实际?根据题干关键词“LA”和“unrealistic”定位到原文G段,扫读本段可以发现G段讲的就是一种新方案,但是这种方案被看作是“It all sounds like bad planning.”和本段最后“until you realise how much we spend trying...and how bad we are at it.”因此,本题的答案为G。
转载请注明原文地址:https://jikaoti.com/ti/ajEYFFFM
本试题收录于:
雅思阅读题库雅思(IELTS)分类
0
雅思阅读
雅思(IELTS)
相关试题推荐
PEOPLE:CROWD::
Akeyfeatureofquantuminformationscienceistheunderstandingthatgroupsoftwoormorequantumobjectscanhavesta
Relativismamountstothedenialofanobjectiveworldaboutwhichtrueandfalsestatementscanbemade;thereisnoabs
Sendingarobotintospacetogatherinformationiscertainlyaviableoption,Linebutshouldberegardedonlyasthat--anopt
AstheworksofdozensofwomenwritershavebeenrescuedfromwhatE.P.Thompsoncalls"theenormouscondescensiono
ThispassageisadaptedfromTheAmericanRepublic:Constitution,Tendencies,andDestinybyO.A.Brownson,1866.Thean
Howisanewbornstarformed?Fortheanswertothisquestion,wemustlooktothefamiliarphysicalconceptofgravitat
Researchhasproventhatunliketheirsober______whosloweddownaftermakingamistaketotrytocorrecttheiractions,menwho
DuringaEuropeanbroadcastin2002,televisionviewerswere(i)______byabordercollie’sabilitytocorrectlyretrievespecifi
IfWilliamshadafault,itwasanalmostcomplete(i)______others,aproclivityborderingon(ii)______.
随机试题
Everylivingthinghasaninnerbiologicalclockthatcontrolsbehavior.Theclockworksallthetime;evenwhentherearenoou
关于旋转阳极X线管阳极的叙述,错误的是
临床牙冠是指()
税务稽查员甲发现A公司欠税80万元,便私下与A公司有关人员联系,要求对方汇10万元到自己存折上以了结此事。A公司交10万元汇到甲的存折上以后,甲利用职务上的便利为A公司免交80万元税款办理了手续。对甲的行为应如何处理?
下列项目中,影响企业可供分配的利润的有()。
某企业5月份计划投产并完工A、B两种产品,预计A、B两种产品的数量分别为160件和180件,耗用甲材料的标准分别为8千克/件和4千克/件,甲材料标准单位成本为17元/千克,5月份实际生产A、B两种产品的数量分别为150件和200件,实际耗用材料分别为21
下列属于监管当局对银行机构进行现场检查的重点内容有()。
在目前财政拮据的情况下,在本市增加警力的建议不可取。在计算增加警力所需的经费开支时,光考虑到支付新增警员的工资是不够的,同时还要考虑到支付法庭和监狱新雇员的工资.由于警力的增加带来的逮捕、宣判和监管任务的增加,势必需要相关机构同时增员。以下哪项如果为真,将
反常积分()。
Howthoughtfulofhim______tomakeallthenecessaryarrangementsforus!
最新回复
(
0
)