After long negotiation, the firm contracted to build a double-purpose bridge across the river.

admin2019-06-28  10

问题 After long negotiation, the firm contracted to build a double-purpose bridge across the river.

选项

答案经过长时间的谈判之后,这家公司才签约承建一座横跨大江的两用大桥。

解析
转载请注明原文地址:https://jikaoti.com/ti/PSiGFFFM
本试题收录于: 英语题库普高专升本分类
0

最新回复(0)