首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
医学
A、Cultural difference. B、Gender-related difference. C、Ethnical difference. D、Social rank. D录音讲到对于时间的观念不同是a cultural difference,这
A、Cultural difference. B、Gender-related difference. C、Ethnical difference. D、Social rank. D录音讲到对于时间的观念不同是a cultural difference,这
admin
2013-10-31
38
问题
There are two kinds of people in the world and I’m one of them. I’m the kind of person who likes to be on time for things. In fact, I like to be early. Let’s say, I need to catch a flight which is leaving at 4 p.m. Usually, I am at the gate, ticket out, ready to go no later than 7:14 a. m. My wife is the other kind of person. For her, the ideal way to catch a plane would be to arrive at the airport as the plane was taking off.
Part of this is a cultural difference. I grew up in Wasp that is white Anglo-Saxon protestant household and my wife grew up in a Cuban household. Wasps tend to follow schedule strictly; Cubans tend to be more relaxed. If a Wasp wedding is scheduled to start at 2 p.m Saturday, the wedding march will start at 2 p.m. sharp and the bride would come down the aisle at 2:03 no matter what, even if the originally scheduled groom has bailed out and the bribe has to use an emergency back-up groom taken right off the street. Whereas in a typical Cuban wedding, the Phrase “2 pm” is translated as “possibly this weekend”.
But the difference between my wife and me is not totally cultural. I think it is also gender-related. I believe that men and women do not view the time the same way. I think that in general, women think there is more time in the universe than men do.
21. What is the talk mainly about?
22. What kind of person is the speaker?
23. If a Wasp wedding is scheduled to start at 2 p.m, what time then would the bribe come down the aisle?
24. How would a Wasp family react if the originally scheduled groom has bailed out?
25. Which of the following is not mentioned as a reason for the difference between the couple?
选项
A、Cultural difference.
B、Gender-related difference.
C、Ethnical difference.
D、Social rank.
答案
D
解析
录音讲到对于时间的观念不同是a cultural difference,这其中就包括民族因素,录音最后还指出这同样也是gender—related。
转载请注明原文地址:https://jikaoti.com/ti/JyNDFFFM
本试题收录于:
医学博士外语题库考研分类
0
医学博士外语
考研
相关试题推荐
A.高钾血症B.心血管疾病C.呼吸衰竭D.低钾血症、感染急性肾衰竭多尿期的主要死亡原因是
A.高钾血症B.心血管疾病C.呼吸衰竭D.低钾血症、感染慢性肾衰竭最常见的死亡原因是
在葡萄糖刺激时,非胰岛素依赖型糖尿病病人的胰岛素水平可出现
DNA连接酶催化的化学反应能够
Despitegrowingnumbersofjoggers,CanadaFitnessSurveysacrossthecountrydemonstratethatCanadiansarelessphysicallyfit
Weareallmembersofaculture.Howweinterprettherealityaroundus,whatweconsidertobereasonablestatementsandbehavi
A、Takethemedicinefromthewoman.B、Gotoseeaspecialist.C、Stopeatinganddrinkingforafewdays.D、Stayinbedforacou
A、Gotobedearlierthenextnight.B、Gotobedasusualthenextnight.C、Takeanapthenextday.D、Sleeplatethenextfewda
A、Saturdaymorning.B、Saturdaynight.C、Saturdayafternoon.D、Nextweekend.D对话中男士说:Icandothattheweekendafterthisone,即“我
随机试题
A.煅龙骨B.煅牡蛎C.两者都选D.两者都不属于桑螵蛸散的药物有
关于毛细血管的特性,不正确的是
超声医学图像存档与通信系统的主要功能中不包括
我国建设项目环境影响登记表的填写单位一般是()。
水利工程施工项目的招标中,评标委员会由()负责组建。
某35kV电气装置工程项目,施工项目经理部为了保证施工项目按期完成,使资源配置尽量达到合理和最大程度地降低成本,就组织人员进行施工进度计划的编制,编制采用的方法是横道图施工进度计划。在施工过程中的部分施工工序和要点如下:(1)坚持先交接试
采购环节设备验收的内容包括()。
()在多因素模型的基础上突破性地发展了资本资产定价模型,提出套利定价理论(APT),进一步丰富了证券组合投资理论。
老师对于()相当于()对于病人
HowtoBeEffectiveReadersI.IntroductionofreadingandhowtobeeffectivereadersA.IntroductionofreadingThemeaningof
最新回复
(
0
)