首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A、The workers on the underground platforms were replaced by machines. B、It became the first completely automatic railway in the
A、The workers on the underground platforms were replaced by machines. B、It became the first completely automatic railway in the
admin
2009-09-12
61
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different from the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so called "command spots". The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. If one train stays too long at a station, the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、The workers on the underground platforms were replaced by machines.
B、It became the first completely automatic railway in the world.
C、A completely automatic line was added to its network.
D、Its trains became computer-controlled.
答案
B
解析
What happened to the London underground railway about three decades ago?
[听前预测] 由选项中的underground platform,replaced,first,added,computer-controlled可推断本题可能与地铁的改进有关。
[答案详解] 细节辨认题[考频:16]。本题关键句为“The world’s first completely automatic railway has been built under the busy streets of London... The new Victoria Line was opened in 1969.”1969年第一条全自动地铁在伦敦开通。故正确答案为B)。
转载请注明原文地址:https://jikaoti.com/ti/93DFFFFM
0
大学英语四级
相关试题推荐
A、Itenablespeopletoearnmoremoney.B、Itteachestheimportanceoffinancing.C、Ithelpspeoplewithbudgeting.D、Itintrodu
A、Itenablespeopletoearnmoremoney.B、Itteachestheimportanceoffinancing.C、Ithelpspeoplewithbudgeting.D、Itintrodu
A、Napsmayhelptoimproveworkefficiency.B、Napsmayhelpworkersworkforlongerhours.C、Napsmaystopworkersdevelopinghe
A、Helpothersfornothinginreturn.B、Savemoneytohelpothers.C、Trytomakemoremoney.D、Gethelpfromtherichones.A
A、Itcanwarnofficeworkersnottofrownatwork.B、Itcanreducetheharmoffacingcomputer.C、Itcanmakeofficeladies’exp
Scientistshavebegunusingsatellite-basedsystemstopredictvolcaniceruptions.Thisallowsblanketcoverageoftheentirewo
A、Inaninsurancecompany.B、Attherailwaystation.C、Atthepostoffice.D、Atthecustoms.CM:Thispackageisgoingtobesen
A、Toreceivecardsmadebyhand.B、Togetfriends’cardsonherbirthday.C、Tosendthecardstoherfriendsinothercountries.
A、Sheeatsoutatarestaurant.B、Shevisitscloserelatives.C、Shegoestoseeamovie.D、Sheholdsadanceparty.BHowdoesEl
随机试题
留置权的成立必须满足以下条件()。
某均质砂土建筑地基采用沉管砂石桩处理。砂土地基的天然地基承载力为130kPa,砂土地基的天然孔隙比e0=0.79,最大孔隙比emax=0.8,最小孔隙比emin=0.65,要求处理后砂土的相对密实度达到Dr=0.82。初步设计时,按等边三角形布桩,砂石桩直
施工现场应按照现行国家标准制定降噪措施,并应对施工现场的噪声值进行()。
乙股份有限公司2007—2013年与无形资产业务有关的资料如下:(1)2007年12月1日,以银行存款300万元购入一项专利权,没有其他相关税费。该专利权预计使用年限为10年,预计净残值为零。(2)2011年12月31日,预计该专利权的可收回金额为14
()不属于发售公开募集基金应符合的条件。
某图书馆总有人占座.你作为图书馆管理人员,请你去协调这件事情,你将如何做?
关于医学常识,下列说法正确的是()。
若有以下程序#includemain(){inta=0,b=0,c=0c=(a+=++b,b+=4);printf("%d,%d,%d\n",a,b,c);}则程序的输出结果是‘
LiuXiangAsia’sGoldRushAsLiuXiangracedtovictoryinthe1I0-me
A、Topersuadehertotaketheschoolbuswithhim.B、Toaskforherhelpinphysicsexamination.C、Tofindoutherattitudetowa
最新回复
(
0
)