首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
For nearly a century, two United States governmental agencies, the United States Army Corps of Engineers and the Bureau of Recla
For nearly a century, two United States governmental agencies, the United States Army Corps of Engineers and the Bureau of Recla
admin
2022-07-08
52
问题
For nearly a century, two United States governmental agencies, the United States Army Corps of Engineers and the Bureau of Reclamation, have constructed dams to store water and to generate electricity. Building these dams provided cheap electricity, created jobs for workers, stimulated regional economic development, and allowed farming on lands that would otherwise be too dry. But not everyone agrees that big dam projects are entirely beneficial. Their storage reservoirs stop the flow of rivers and often submerge towns, farms, and historic sites. They prevent fish migrations and change aquatic habitats essential for native species.
The tide may have turned, in fact, against dam building. In 1998 the Army Corps announced that it would no longer be building large dams. In the few remaining sites where dams might be built, public opposition is so great that getting approval for projects is unlikely. Instead, the new focus may be on removing existing dams and restoring natural habitats. In 1999 Bruce Babbitt, the then United States interior secretary, said, —Of the 75,000 large dams in the United States, most were built a long time ago and are now
obsolete
and unsafe. They were built with no consideration of the environmental costs. As operating licenses come up for renewal, dam removal and habitat restoration to original stream flows will be among the options considered.
The first active hydroelectric dam in the United States to be removed against the wishes of its owners was the 162-year-old Edwards Dam, on the Kennebec River in Augusta, Maine. For many years, the United States Fish and Wildlife Service had advocated the removal of this dam, which prevented migration of salmon, shad, sturgeon, and other fish species up the river. In a precedent-setting decision, the Federal Energy Regulatory Commission ordered the dam removed after concluding that the environmental and economic benefits of a free-flowing river outweighed the electricity generated by the dam. In July 1999 the dam was removed and restoration work began on wetlands and stream banks long underwater.
The next dams likely to be taken down are the Elwha and Glines Dams on the Elwha River in Olympic National Park in the state of Washington. Built nearly a century ago to provide power to lumber and paper mills in the town of Port Angeles, these dams blocked access to upstream spawning beds for six species of salmon on what once was one of the most productive salmon rivers in the world. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there now are only concrete walls holding back still water and deep beds of muddy deposits. Removing the mud, uncovering gravel beds where fish spawn, and finding suitable salmon types to rebuild the population is a daunting task. Congress will have to appropriate somewhere around $300 to $400 million to remove these two relatively small dams and rehabilitate the area.
Environmental groups, encouraged by these examples, have begun to talk about much more ambitious projects. Four giant dams on the Snake River in Washington State, for example, might be removed to restore salmon and steelhead fish runs to the headwaters of the Columbia River. The Hetch Hetchy Dam in Yosemite National Park might be taken down to reveal what John Muir, the founder of the prestigious environmental organization Sierra Club, called a valley—just as beautiful and worthy of preservation as the majestic Yosemite. Some groups have even suggested removing the Glen Canyon Dam on the Colorado River. In each of these cases, powerful interests stand in opposition. These dams generate low-cost electricity and store water that is needed for agriculture and industry. Local economies, domestic water supplies, and certain types of recreation all would be severely impacted by destruction of these dams.
The word obsolete in Paragraph 2 is closest in meaning to________.
选项
A、unpopular
B、inefficient
C、out of date
D、unnecessary
答案
C
解析
obsolete意为“过时的;过于老旧的”,只有C项out of date“过时的;过期的”与其意思相近,故正确答案为C项。A项“不流行的”、B项“效率低的”和D项“不必要的”都不符合题意。
转载请注明原文地址:https://jikaoti.com/ti/8F1YFFFM
本试题收录于:
CATTI二级笔译综合能力题库翻译专业资格(CATTI)分类
0
CATTI二级笔译综合能力
翻译专业资格(CATTI)
相关试题推荐
Masstourismisaformoftourismthatinvolvestensofthousandsofpeoplegoingtothesameresortoftenatthesametimeofa
WhichofthefollowingistrueaccordingtoanewstudyfromtheUniversityofLeeds?
Thereportbelievesthatsomecompaniestendtofalsifyabloodtestresult.
WelcometotheChineseConsulate-GeneralinMelbourneforthe"ChineseCultureDay"2018.SpeakingoftheChineseculture,man
Smallcommunities,withtheirdistinctivecharacter—wherelifeis【C1】________andintenselyhuman—aredisappearing.Somehave【C2】
ThedevicehasasensorthatmeasuresbodytemperatureandchangestotheheartratecalledHRV.
Indeed,it’snotmuchofanexaggerationtosaythatChopin’smusicflowsthroughthePolishnationalconsciousnesslikesomeso
1975年,摄影师米歇尔.孔泰(MichelComte)在罗马俱乐部(ClubofRome)发表演讲。他站在科学家、商界领袖和政界人士面前,提出气候灾难即将到来的观点。(standupbefore;beonthehorizon)
Inwriting,______canbeusedtoencloseexplanatoryoradditionalmaterial,withoutwhichthepassagecanalsobecomplete.
Avoideggs.Drink8glassesofwateraday.Eatingcarbswill(1).Nutritionaladvicesuchasthishasbeentoutedforyearsbu
随机试题
城市地下管线探测按具体对象可分为()。
先导产业所具有的特点有()。
资产评估师执行资产评估业务过程中,应当在每个具体的工作过程形成()。
银团贷款中,单家银行担任牵头行时,其承贷份额原则上不少于银团融资总金额的();分销给其他银团贷款成员的份额原则上不低于()。
某工厂每年需消耗煤100000吨,每吨煤的价格为1200元,每吨煤的年保管费4%,单次订货成本为6000元,假设煤的价格不因采购数量的不同而产生折扣。根据以上资料,回答下列问题:该工厂应将采购来的煤以()的方式进行保管。
在“探究水沸腾”的实验中,某实验小组观察到下图(a)、(b)所示的两种情景.你认为哪一种是水沸腾时的情景?
陈述性知识又叫描述性知识,如()。
上一次引进美国大片《廊桥遗梦》,仅仅在滨州市放映了一周时间,各影剧院的总票房收入就达到800万元。这一次滨州市又引进了《泰坦尼克号》,准备连续放映10天,1000万元的票房收入应该能够突破。根据上文包括的信息,分析上述推断最可能隐含了以下哪项假设?
请在【答题】菜单下选择【进入考生文件夹】命令,并按照题目要求完成下面的操作。注意:以下的文件必须保存在考生文件夹下。为了更好地控制教材编写的内容、质量和流程,小李负责起草了图书策划方案(请参考“图书策划方案.docx”文件)。他需要将图
9-11TerroristAttackThereasonofthe9-11terroristattackconcludedbyCommissionhearingsinWashingtonwasthegovernm
最新回复
(
0
)