The bridge______the fishing village and the town underwent extensive repair work after it collapsed in last week’s storm.

admin2017-04-10  21

问题 The bridge______the fishing village and the town underwent extensive repair work after it collapsed in last week’s storm.

选项 A、commuting
B、traveling
C、connecting
D、transferring

答案C

解析 根据上下文语义,此处表示“连接渔村和城市的桥梁”,因此动词connect(连接)的动名词形式(C)connecting为正确答案。(A)commuting意为“来回往返于……”,(B)traveling意为“旅行”,(D)transferring意为“转让,转移”。
转载请注明原文地址:https://jikaoti.com/ti/u1RsFFFM
0

最新回复(0)