首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
50
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M11】
选项
答案
CORRECT
解析
转载请注明原文地址:https://jikaoti.com/ti/tuTYFFFM
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
ThemergerwasexpectedtohelpthecombinedcompanytoOnereasongivenforthemerger’slackofsuccessis
WhatdoesKatherinedislikeaboutthecourse?Shebelievesthatmanagementislikelyto
HowtoapproachListeningTestPartTwo•Thispartisintwosections.Ineachsectionyoulistentofiveshortmonologues,spo
OutsourcingreferstoAfterthepartnershipdealhadbeenagreedupon,theshippingcompanywasableto
ThephoneswillbehandledbyNextweek’smeetingofprojectmanagerswillbeon
What’stheespeciallybigissuethatholdsbacktheInternet?WhatisthespecialfeatureofEffnet’sfirewallsystem?
•Youwillhearfivespeakerstalkingaboutbusinesstrips.•Foreachrecording,choosethereasonthespeakergivesforthetr
YouwillhearapartofaspeechabouttheAsiancrisis.Choosethebestanswerforeachofthequestions(23—30).Markonele
YouwillheararadiointerviewwithDr.EdwardGordon,theHumanResourcesmanagerfromOrchardSupplyHardware.Foreachq
—Readthearticleaboutinterviewbelow.—Choosethebestsentencetofillineachofthegaps.—Foreachgap8-12,markonelet
随机试题
脂肪是一类由_______三种元素组成的有机化合物。
火灾报警控制器是火灾自动报警系统中的主要设备,其主要功能包括多方面。下列关于火灾报警控制器功能的说法中,正确的是()。
根据《企业安全生产费用提取和使用管理办法》,施工投标人安全防护、文明施工措施的报价下限,是依据工程所在地工程造价管理机构测定费率计算所需费用总额的()。
根据规定,出口企业最迟于货物出运——天前,向签证机构申请办理《一般原产地证明书》;或出口企业最迟于货物出运_____天前,向签证机构申请办理《普惠制产地证》。()
A注册会计师负责对甲公司20×8年度财务报表进行审计。在对甲公司20×8年12月31日的存货进行监盘时,发现部分存货的财务明细账、仓库明细账、实物监盘三者的数量不一致,相关资料如下表所示。要求:(2009年)针对存货的财务明细账数量与实物监盘数量不
关于校对,说法正确的有()。
“因材施教”教育原则的依据是人的身心发展的()。
根据下列资料,回答问题。全国外出农民工与本地农民工人数相差最大的一年是()年。
戊戌变法、辛亥革命和新文化运动发生的基本条件是:
信息的______是指如何把信息组织成用户容易接受的形式,其目标是方便用户使用、保证信息的安全和完整。
最新回复
(
0
)