The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northern most s

admin2008-10-11  51

问题    The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northern most state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins.  It is massive in size and extremely operating.
   The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground.  It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels of crude oil can be pumped through it daily.
   Resting on H-shaped steel racks called "bents, "long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permanently frozen ground. A little more than half of the pipeline is elevated above the ground.  The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
   One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry.  In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs.  Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings.  Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagements and even theft the Alaska pipeline has been completed and is operating.  
The passage primarily discusses the pipeline’s ______.

选项 A、operating costs
B、employees
C、consumers
D、construction

答案D

解析 综观全文,本文主要讨论了管道的建造。
转载请注明原文地址:https://jikaoti.com/ti/fakYFFFM
0

随机试题
最新回复(0)