Sumac Inc.submitted their bid after the deadline; ______, they were not eligible for consideration.

admin2019-04-04  16

问题 Sumac Inc.submitted their bid after the deadline; ______, they were not eligible for consideration.

选项 A、therefore
B、moreover
C、besides
D、however

答案A

解析 Sumac在截止日期之后才递交投标书,因而不会在考虑之内。therefore因此,所以。moreover而且,此外。besides除…之外。however无论如何。根据句意,前后是因果关系,因而A选项符合题意。