首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
admin
2018-04-03
61
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
Why do American Indians protest against the construction of this pipeline?
选项
A、Because it will cost up to $ 3.8 billion.
B、Because it threatens the region’s water supply.
C、Because it will make many people lose their jobs.
D、Because it will force many people to leave their homes.
答案
B
解析
细节题。定位到文章第二段第五句“They also say the pipeline could pollute their main water source,the Missouri River.”可知,他们认为这条管道可能会污染当地的主要水源——密苏里河,所以印第安人反对管道建设的一个原因是担心管道会污染水源一。A选项“因为工程耗资达38亿”,不是印第安人抗议的原因;C选项“因为很多人会因此而失业”和D选项“这将迫使很多人离开家园”均未在文中提及。故选B。
转载请注明原文地址:https://jikaoti.com/ti/XCGYFFFM
0
成人本科学位英语
相关试题推荐
Jennydidn’thavetimetogotoconcertlastnightbecauseshewasbusy______forherexamination.
Nomatterwhoyouareorwhereyoucomefrom,onethingiscertain:youareacquaintedwiththemosquito(蚊子)—althoughyouprobab
Manyayoungpersontellsmehewantstobeawriter.Ialwaysencouragesuchpeople,butIalsoexplainthatthere’sabigdif
Dataprocessingisaseriesofoperationscarriedoutondatatogetinformation.【C1】______seriesofoperationsisalsocalledt
Ihearmanyparentscomplainingthattheirteenagechildrenarerebelling.Iwishitwereso.Atyourageyououghttobegrowin
Whensomeonehasmoney【B1】hewantstoputinasafeplace,he【B2】takesittoabank.Untilrecentlythevery【B3】oftheban
Cothroughthisdoor______youwillfindthemanwaitingforyouthere.
W:IdohopePeterdowellinhisstudiesthissemester.M:______
Throughouthistory,peoplehavebeenthevictimsofpickpockets.Today,pocket-pickingisoneofthemostrapidlyincreasingcri
随机试题
为帮助社区贫困家庭改善生活质量,摆脱贫困状态,社会工作者对社区贫困家庭情况进行摸查,对有就业技能的人员通过多种形式和渠道提供职业技能培训,转变就业观念。社会工作者所做的上述工作是最低生活保障服务内容中的()。
正常前庭导水管的宽度小于
工某,长期抑郁,现眩晕心悸,少寐,心烦易怒,舌红,苔少,脉弦细数,治疗方剂宜选
治疗“血瘀”所致的“产后恶露不绝”的代表方是
总进度计划不属于()。
信息披露的方式主要包括:发行人及其主承销商应当将发行过程中披露的信息刊登在至少两种中国证监会指定的报刊,同时将其刊登在中国证监会指定的互联网网站,并置备于中国证监会指定的场所,供公众查阅。( )
中国古典园林对树木花卉的配置和种植,重在表现自然,讲究形与神、意与境的和谐统一。()
一则公益广告劝告人们,酒后不要开车,直到你感到能安全驾驶的时候才开。然而,在医院进行的一项研究中,酒后立即被询问的对象往往低估他们恢复驾驶能力所需要的时间。这个结果表明,在驾驶前饮酒的人很难遵循这个广告的劝告。下面哪项如果为真,能最有力地支持以上结论?
Whichisthenewpackaging?
HowShouldYouBuildupYourVocabularyExactlywhatdoyoudoduringanormalday?Howdoyouspendyourtime?PaulT.Rank
最新回复
(
0
)