问题 1)The responsible period of the carrier for the loss of or damage to the cargo as well as delay in delivery under CMR convention is between (    )

选项 A、the port to port
B、the door to door
C、the rail to rail
D、the time the carrier taking over the goods and the time of delivery

答案D

解析 根据CMR公约的规定,承运人的责任期间是从接受货物时起至交付货物为止,因此答案应该是D,这一道题是考试CMR公约下承运人的责任期间。