Support structure under the Main St. bridge have corroded____faster than the bridge’ s designer had predicted.

admin2015-05-10  29

问题 Support structure under the Main St. bridge have corroded____faster than the bridge’ s designer had predicted.

选项 A、a lot
B、so too
C、very
D、real

答案A

解析 句子要表示“快得多”的意思,因此可以修饰比较级的A为正确答案。
转载请注明原文地址:https://jikaoti.com/ti/Nu2QFFFM
0

最新回复(0)