首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Who’s to blame? The trail of responsibility goes beyond poor maintenance of British railways, say industry critics. Stingy gover
Who’s to blame? The trail of responsibility goes beyond poor maintenance of British railways, say industry critics. Stingy gover
admin
2019-01-25
36
问题
Who’s to blame? The trail of responsibility goes beyond poor maintenance of British railways, say industry critics. Stingy governments—both Labor and Tory—have cut down on investments in trains and rails. In the mid-1990s a Conservative government pushed through the sale of the entire subsidy-guzzling rail network. Operating franchises were parceled out among private companies and a separate firm, Railtrack, was awarded ownership of the tracks and stations. In the future, the theory ran back then, the private sector could pay for any improvements—with a little help from the state—and take the blame for any failings.
Today surveys show that travelers believe privatization is one of the reasons for the railways’s failures. They ask whether the pursuit of profits is compatible with guaranteeing safety. Worse, splitting the network between companies has made coordination nearly impossible. "The railway was torn apart at privatization and the structure that was put in place was...designed, if we are honest, to maximize the proceeds to the Treasury, " said Railtrack boss Gerald Corbett before resigning last month in the wake of the Hatfield crash.
Generally, the contrasts with mainland Europe are stark. Over the past few decades the Germans, French and Italians have invested 50 percent more than the British in transportation infrastructure. As a result, a web of high-speed trains now crisscross the Continent, funded by governments willing to commit state funds to major capital projects. Spain is currently planning 1, 000 miles of new highspeed track. In France superfast trains already shuttle between all major cities, often on dedicated lines. And in Britain? When the Eurostar trains that link Paris, London and Brussels emerge from the Channel Tunnel onto British soil and join the crowded local network, they must slow down from 186 mph to a maximum of 100 mph—and they usually have to go even slower.
For once, the government is listening. After all, commuters are voters, too. In a pre-vote spending spree, the government has committed itself to huge investment in transportation, as well as education and the public health service. Over the next 10 years, the railways should get an extra £60 billion, partly through higher subsidies to the private companies. As Blair ackoowledged last month, "Britain has been underinvested in and investment is central to Britain’s future. " You don’t have to tell the 3 million passengers who use the railways every day. Last week trains to Darlington were an hour late—and crawling at Locomotion No. 1 speeds.
What does the author think of Blair’s acknowledgement?
选项
A、It’s too late to improve the situation quickly enough.
B、It’s a welcomed declaration of commitment.
C、Blair should preach it to other travelers.
D、Empty words can’t solve the problem.
答案
D
解析
该题为细节题。最后一段倒数第三句,布莱尔说:“英国投资不足,而投资是英国未来的关键。”最后一段的最后两句表明了作者对布莱尔所说话的态度,“You don’t have to tell the 3 million passengers who use the railways every day.Last week trains to Darlington were an hour late—and crawling at Locomotion No.1 speeds.”意思是:“你不必把这些话告诉三百万每天坐火车的乘客。上周,去达灵顿的火车晚点了—个小时一一以‘火车第一速度’缓慢爬行。”因此,作者认为布莱尔只是说空话、喊口号解决不了问题,故选D。
转载请注明原文地址:https://jikaoti.com/ti/NZGsFFFM
本试题收录于:
公共英语四级笔试题库公共英语(PETS)分类
0
公共英语四级笔试
公共英语(PETS)
相关试题推荐
Comparisonsweredrawnbetweenthedevelopmentoftelevisioninthe20thcenturyandthediffusionofprintinginthe15thand1
Asweenterthe21stcentury,anewglobaleconomydrawsnationsevercloser.Butourgrowinginterdependence【21】______onm
Although【21】______circuitsmadecomputerssmaller,theprocessingunitsstillconsisted【22】______anumberofcircuits
Tostartwith,youshouldselectthe______.
WheredomostBritishyoungpeoplespendtheirsparetime?
Trains/Railways
BenjaminBarber’sFear’sEmpirepresentsacaseagainsttherecentunilateralimpulsesinU.S.foreignpolicy.AccordingtoBar
PeoplelivingonpartofthesouthcoastofEnglandfaceaseriousproblem.In1993,theownersofalargehotelandofseveral
Theworld’stropicalrainforestscomprisesome6%oftheEarth’slandareaandcontainmorethanhalfofallknownlifeforms,o
随机试题
注射用油对皂化值的质量要求是
碧海公司通过在证券交易所的交易,于2010年3月8日持有蓝天公司公开发行股份的5%,根据以上情况,回答下列问题:碧海公司应该进行哪些工作?()
在项目无资金约束、寿命不同、产出不同的条件下,方案经济比选只能采用:
某土方工程发包方提出的估计工程量为1500m3,合同中规定土方工程单价为16元/m3,实际工程量超过估计工程量10%时,对超出10%的部分调整单价,单价调为14元/m3。结束时实际完成土方工程量为1800m3,则土方工程款为()元。
混凝土坝采用竖缝分块时,浇块高度一般在()m以内。
商品房销售面积指报告期内出售商品房屋的合同总面积,包括()。
《中华人民共和国劳动法》规定用人单位延长劳动者工作时间,一般情况下,每月不得超过________小时。
在如图5-3所示的Excel中,在D3单元格中输入公式“=AVERAGE(A1:D2,6)”,则D3单元格中显示的值为(54)。
1.在考生文件夹中,存有文档WT9.DOC,其内容如下:[文档开始]新能源技术有太阳能技术、生物能技术、潮汐能技术、地热能技术、风能技术、氢能技术和受控热核聚变技术等多种。新能源技术有太阳能技术、生物能技术、潮汐能技术、地热能技术
WhataccountsforthegreatoutburstofmajorinventionsinearlyAmerica-breakthroughssuchasthetelegraph,thesteamboatand
最新回复
(
0
)