首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
How many are there quality control inspection points? At first inspection stage, we inspect
How many are there quality control inspection points? At first inspection stage, we inspect
admin
2010-08-20
37
问题
How many are there quality control inspection points?
At first inspection stage, we inspect
V: Could you tell me a bit about quality control at the factory?
P: Well, there are four main quality control inspection points. We begin by visiting our suppliers to make sure we are happy with their quality control. Next, e inspect all goods on arrival at our factory and the third inspection point is during production. And the final stage is chemical analysis of our finished goods.
V: And what do you look for at each of the four inspection points?
P: Well each stage is different. With our suppliers, for instance, we inspect their QC processes and, even more importantly, their factory hygiene. If we’re not happy with their hygiene, we’ll caned the supply contract. At the goods in stage we make sure that order quantities are correct and the quality is OK. We also check the transport packaging. If the packaging is damaged, the warehouse shelf-life can be reduced.
V: And what quality checks do you run during production?
P: We take samples to check there isn’t too much cooking oil on the snack and that each snack has the minimum amount of flavouring. We also check the size of the snacks and their crispness. If the snacks are too oily, they go soft.
V: So that leaves the finished goods. What do you check for at the final QC stage?
P: We check individual bags to make sure that the packet weight is above the acceptable minimum and that the packet is sealed properly. We also check the taste.
V: And how do you do that?
P: Well, we eat them. How rise? We also do chemical analysis to check things like fat levels and other information that we have to put on the packets.
选项
A、QC process
B、hygiene
C、QC process and hygiene
答案
C
解析
转载请注明原文地址:https://jikaoti.com/ti/DBvYFFFM
本试题收录于:
BEC初级听力题库BEC商务英语分类
0
BEC初级听力
BEC商务英语
相关试题推荐
Lookatthenotesbelow.Youwillhearawomanleavingamessageaboutameeting.TodayBusinessMagazine
Lookatthenotebelow.Youwillhearamanphoningaboutadelivery.
YouwillheararadiointerviewwithabusinessmancalledBrettPorter,whodevelopedaproductcalledRainaway,atypeofwater
Lookatthenotebelow.Youwillhearawomanleavingamessageaboutwheretoholdameeting.
Lookatthenotebelow.Youwillhearamanbuyingalaptop.InformationofcustomerTypeoflaptop【C5】______Thistypeis【C6】__
Lookatthenotesbelow.Youwillhearamanphoningforinformationaboutameeting.NOTESChan
Youwillhearaninterviewwithsomemythsaboutbanks.Foreachquestion(23-30),markoneletter(A,BorC)forthecorrect
Youwillhearfiveshortrecordings.Fivepeoplearegivingadviceonhowtogivefeedbacktoemployees.Foreachrecording,
•Readthearticlebelowaboutprocessmanagementtoqualityimprovement,andthequestionsontheoppositepage.•Foreachque
•Lookatthenotesaboutqualitiesofgreatmanagers.•Someinformationismissing.•Youwillhearpartofapresentation
随机试题
波峰焊焊接流水工艺中,涂助焊剂方式有()()(),刷涂式和浸涂式。
软磁盘的特点是()。
出现有光泽黑便,且粪便潜血试验呈阳性症状时,首先考虑的疾病是()。
在R、L、C元件串联电路中,施加正弦电压U,当Xc>XL时,电压U与I的相位关系应是( )。
中央银行增加基础货币的途径有()。
下列关于投资风险的说法中,正确的有()。
打击犯罪是公安机关执行思想的核心。()
从1,2,3,……,30这30个数中,取出若干个数,使其中任意两个数的积都不能被4整除。问最多可取几个数?
一条生产流水线上有甲、乙两位工人,流水线上有400个零件尚未装配。其中甲每分钟装配9个零件,乙每分钟装配7个零件。而流水线上也在不断地增加新的零件。在第50分钟结束的时候,甲、乙两人刚好把流水线上的零件装配完。则流水线上每分钟增加的零件有()个。
代田法
最新回复
(
0
)