首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bi
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bi
admin
2007-01-12
27
问题
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bid chiefs said last night.
Transport experts told the International Olympic Committee scrutinizing Britain’s chances that London’s railways and roads would soon be the envy of the world.
Once improvements were in place, athletes would spend time "competing not commuting", bid leader Lord Coe told the IOC panel on the first day of their visit.
The need for an overhaul came after the IOC criticised London’s " obsolete" public transport systems in a report last May.
Yesterday the London 2012 bid made a series of promises including;
£ 10 billion of investments including a £ 1 billion East London line extension, longer Jubilee line trains and Northern line upgrades.
A train serving the main Olympic Park at Stratford, East London, every 15 seconds, on ten different rail lines.
Twelve-carriage, 225kph (140mph) javelin trains using the Channel Tunnel Rail Link and taking passengers between Straford and King’s Cross in six-and-a-half minutes.
Tube trains running until 2:30 a. m. every day of the Olympics.
Connecting services which will allow visitors to reach the Olympic Park from 309 stations.
The 13-member IOC panel will today have its first taste of the Underground, with a Jubilee line trip to the Millennium Dome. They will also travel on the Channel Tunnel Rail Link, watching a video outlining the transport improvements to be delivered every year up to 2012.
But they will spend most of their time on coaches as they travel to such key sites as Wembley and Wimbledon.
Transport Minister Tony McNulty admitted there were concerns about how London would cope with 500, 000 extra visitors a day. But Transport for London said the Olympic fortnight in August would lead to only a five percent increase in passengers—when 20 percent of London’s commuters were on holiday. Questions:
According to Paragraph 1, London’s public transport system used to be______.
选项
答案
obsolete/a sick man
解析
(文章第一段提到London’s public transport system is no longer the“sick man”but the“jewel in the crown”,即伦敦的交通系统不再是“sick man”而是“jewel in the crown”,由此可知伦敦的交通系统过去是a sick man。)
转载请注明原文地址:https://jikaoti.com/ti/CPdMFFFM
本试题收录于:
D类竞赛(专科)题库大学生英语竞赛(NECCS)分类
0
D类竞赛(专科)
大学生英语竞赛(NECCS)
相关试题推荐
Noiseconstitutesarealandpresentdangertopeople’shealth.Dayandnight,athome,atwork,andatplay,noisecanproduce
Asourbosswasawayonabusinesstrip,Iwasaskedto_______theweeklystaffmeeting.
We’vearrangedtogotothecinemaonWednesday,butwecanbe______andgoanotherdayifnecessary.
Whichofthefollowingphrasesindicatesasubject-predicaterelationship?
Whichofthefollowingitalicizedpartsisusedasasubjectcomplement?
Milascribbledtheaddressonalittle_______ofpaper.
Inthesentence"LettingahundredflowersblossomandahundredWschoolsofthoughtcontendisthepolicyforpromotingthepro
(1)Longknownasatelecommunications-equipmentsuppliertoglobalcarriers,HuaweihasalreadytoppledSamsunginChina,thew
幸运的是,发洪水时,这个村子里没有一个人丧生。(attack)
[*]【T1】比尔-盖茨曾经向数千名美同大学毕业生提供了一些职业及生活的建议(offer)。作为世界上最富有的人,他存数十条推特中使用了“影响”、“幸福”、“进步”等词语,唯独没有提到“金钱”。【T2】相反,他告诉毕业生,如果他从今天开始找,
随机试题
信贷规模调控意在控制货币供给的增长,央行可以控制货币供应,但却难以控制私人部门的货币需求,而货币需求的变化可能导致数量型调控政策达不到预期最终目标,美联储自20世纪80年代以来放弃了直接针对货币供应量的调控,就是出于货币需求的变化会对政策效果产生难以预期的
适用情势变更原则的后果在于()
对于Goodpasture综合征说法正确的是
青黛的功能有
下列关于五行生克规律的表述,正确的是()
陈某长年从事药品销售,熟悉药品市场,2013年11月,他委托某制药企业代其生产茵栀黄注射液共计2000件,该企业的《药品生产许可证》核发时间为2008年10月。制药企业委托生产茵栀黄注射液行为的认定,正确的是()
A.体温调节中枢功能障碍B.无菌性坏死物质吸收C.内分泌失常D.散热能力下降E.细菌或病毒感染甲状腺功能亢进引起发热的原因是
公共财政的职能包括()。
为第三人利益订立的合同,原则上只能使第三人获得利益,不能使第三人承担义务。()
(2008年单选13)下列情形中。属于牵连犯特征的是()。
最新回复
(
0
)