How many pre-constructed sections are made on land?
How many pre-constructed sections are made on land?
admin
2013-08-21
51
问题
How many pre-constructed sections are made on land?
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、Ships at sea.
B、A train from the opposite direction.
C、The powerful ocean.
答案
C
解析
最后Professor Massa提到Maglev train的不好之处就在于海洋的巨大威力对海底隧道有很大的威胁。
转载请注明原文地址:https://jikaoti.com/ti/3QLMFFFM
本试题收录于:
C类竞赛(非英语专业本科)题库大学生英语竞赛(NECCS)分类
0
C类竞赛(非英语专业本科)
大学生英语竞赛(NECCS)
相关试题推荐
A、Itwillhelpfixdangerousintersectionsofroads.B、Itwillcontributetoraisingmorefederalfunds.C、Itwillenhancethec
Howmanypre-constructedsectionsaremadeonland?
Howmanypre-constructedsectionsaremadeonland?
Howmanypre-constructedsectionsaremadeonland?
随机试题
男,22岁。既往有HBsAg阳性史,10天前无诱因发烧,体温逐渐上升,波动于37.5~39℃,近3天体温持续在38.5—39.5℃不降,伴有食欲不振、乏力、腹胀及尿黄。查体:T39.5℃,P88次/分,BP110/70mmHg,神清,表情淡漠,未见皮疹,巩
按照法律规范的渊源划分,《机电产品国际招标投标实施办法》属于()。[2012年真题]
工程网络计划费用优化的基本思路是:在网络计划中,当有多条关键线路时,应通过不断缩短()的关键工作持续时间来达到优化的目的
在外包管理工作中,负责制定外包业务范围的是()。
建设投资中包括()。
2011年,某市工业企业(规模以上,下同)用水总量193.27亿立方米.比上年减少1.66亿立方米。其中,取水总量41.26亿立方米,增加0.57亿立方米;河湖海冷却水86.25亿立方米,增加1.09亿立方米。下列说法正确的有
不报、谎报安全事故罪,是指在安全事故发生后,负有报告职责的人员不报或者谎报事故情况,贻误事故抢救,情节严重的行为。犯罪主体为对安全事故负有报告职责的人员,即生产经营单位的负责人、实际控制人、负责经营的投资人以及其他负有报告职责的人员。根据上述定义,下列构成
()首次提出了以培养阅读技能为主的单项语言技能训练方法。
在现实中缺乏充分根据,因而在当前条件下尚不能实现的可能性称之为()
=______.
最新回复
(
0
)